Skip to main content

Ottawa Police Chief Resigns

Peter Sloly has resigned as Ottawa's police chief. (Justin Tang/The Canadian Press)  

CBC News: Peter Sloly resigns as Ottawa's police chief as critics denounce his handling of convoy protest 

Sloly's resignation comes as he's accused of bullying, volatile behaviour behind closed doors 

Peter Sloly has resigned as Ottawa's police chief and will publicly announce his resignation after the Ottawa Police Services Board meeting today, sources tell CBC News. 

The former chief has been criticized over his handling of a truck convoy protest that has caused major disruptions to Ottawa's downtown core. 

Sloly's resignation comes as sources tell CBC News he's been accused of bullying and volatile behaviour that has damaged relations with senior leadership and compromised the force's ability to cope with the truck protest.  

Read more ....  

WNU Editor: The media narrative is that the police chief is resigning because of bullying, and volatile behavior behind closed doors. My gut is telling me something else. That he is resigning because he does not want to implement the measures that the city and federal government now want to impose under the "Emergency Act", and the powers that be want him gone. 

His failure in having his fellow police officers move forcibly against the protesters also surprised his political bosses, and they need someone else to make sure this does not happen. 

On a side note. Ottawa's police department has an exemption to the Covid-19 vaccine mandate. 

Ottawa Police Chief Resigns  

Ottawa police chief Peter Sloly resigns -- CTV News  

Ottawa police Chief Peter Sloly resigns amid ‘freedom convoy’ blockade -- Global News  

Ottawa police chief resigns amid trucker protest in capital -- AP



from War News Updates https://ift.tt/eX8kmpy
via IFTTT

Comments

Popular posts from this blog

U.S. Army Conducts Gunnery Exercise With Latest Air Defense System Sgt Stout.

U.S. Army officials confirmed that a live gunnery exercise at Fort Hood, Texas, is underway, featuring the latest-generation Sgt Stout short-range air defense system. The drills mark a significant step toward full operational integration as units across the force adapt to evolving threats from drones, rotary-wing aircraft, and low-flying munitions. It matters because Sgt. Stout enhances the Army’s ability to defend forward-deployed troops and critical infrastructure from modern aerial threats. Read full Defense News at this link ... A U.S. Army SGT Stout SHORAD air defense vehicle maneuvers into firing position during live-fire training with the 6th Battalion, 56th Air Defense Artillery Regiment at Fort Hood, Texas, on October 3, 2025. (Picture source: U.S. Department of War) Read More from World Defence News https://ift.tt/NYmsS1n via IFTTT

US-built first Saudi MMSC frigate HMS Saud launched at Fincantieri’s shipyard

According to information published by the Saudi Ministry of Defense on December 18, 2025, the first Multi-Mission Surface Combatant frigate constructed in the United States for the Royal Saudi Navy has been officially launched at Fincantieri Marinette Marine’s shipyard in Marinette, Wisconsin. The ship, designated HMS Saud with pennant number 820 and also known as Jalalat Al-Malik Saud in honor of King Saud, is the lead vessel in a four-ship program ordered under Project Tuwaiq through the U.S. Foreign Military Sales framework, a deal that defense officials have repeatedly described as a cornerstone of bilateral naval cooperation. Read more.   The HMS Saud (820) has an overall length of approximately 118 meters, in some sources detailed as 118.6 meters, with a beam of 17.6 meters, a draft of about 4.3 meters, and a full-load displacement estimated at roughly 3,600 tonnes. (Picture source: Saudi MoD) Read full Defense news.  from World Defence News https://ift....

Hellfire and JAGM Missiles Confirm Their Key Role in US Strike Power with New Contract

According to an announcement from the United States Department of Defense, Lockheed Martin has received a contract modification valued at $720 million for the fourth year of production of the Hellfire and Joint Air-to-Ground Missile (JAGM) systems. This award brings the total value of the agreement to approximately $1.49 billion. Work will be carried out at the company’s facilities in Ocala, Florida, with completion expected by September 30, 2028. The program is managed by the Army Contracting Command at Redstone Arsenal, Alabama, and is funded through the fiscal year 2025 missile procurement budget. Read more.  The JAGM, designated AGM-179, builds on the Hellfire’s design with an improved guidance system that incorporates a multi-mode seeker combining semi-active laser and millimeter-wave radar (Picture source: US DoD) Read full Defense news.  from World Defence News https://ift.tt/dvrFwSB via IFTTT