Skip to main content

U.S. Left $7 Billion In Military Hardware In Afghanistan Following The Chaotic Withdrawal Of American Troops Last Year

A Taliban fighter poses with a US-made Afghan air force Blackhawk helicopter at Kandahar airfield in August last year, as weapons fell into the hands of the country's new rulers  

Daily Mail: The US left $7 billion of military gear - including 78 aircraft, 12,000 Humvees and thousands of air-to-ground weapons - in Afghanistan after Biden's chaotic 2021 withdrawal, according to Pentagon report 

* Pentagon report details billion of dollars in arms left in Afghanistan after exit 

* It was prepared for Congress, and obtained by CNN * It says $7 billion in hardware was left behind last year after chaotic withdrawal 

* That includes $1 billion of aircraft and some 22,000 military Humvees 

* The details will provide ammunition for critics who say President Biden should have done a better job of ensuring weapons did not fall into Taliban hands 

* Some 9,524 air-to-ground munitions were also left in the country 

A Pentagon report reveals that billions of dollars in weapons and military equipment transferred to the Afghan government was left behind in Afghanistan after the chaotic U.S. withdrawal from the country. 

In all, about $7 billion worth of hardware remained in the country after the Taliban seized control, according to the report prepared for Congress which was obtained by CNN.  

Read more ....  

Update #1: First on CNN: US left behind $7 billion of military equipment in Afghanistan after 2021 withdrawal, Pentagon report says (CNN)  

Update #2: U.S. Left $7 Billion In Military Hardware In Afghanistan As Taliban Took Over, DOD Reportedly Finds (Forbes).  

WNU Editor: Another reminder on the disastrous U.S. withdrawal from Afghanistan last year.



from War News Updates https://ift.tt/5Qsi8nh
via IFTTT

Comments

Popular posts from this blog

U.S. Army Conducts Gunnery Exercise With Latest Air Defense System Sgt Stout.

U.S. Army officials confirmed that a live gunnery exercise at Fort Hood, Texas, is underway, featuring the latest-generation Sgt Stout short-range air defense system. The drills mark a significant step toward full operational integration as units across the force adapt to evolving threats from drones, rotary-wing aircraft, and low-flying munitions. It matters because Sgt. Stout enhances the Army’s ability to defend forward-deployed troops and critical infrastructure from modern aerial threats. Read full Defense News at this link ... A U.S. Army SGT Stout SHORAD air defense vehicle maneuvers into firing position during live-fire training with the 6th Battalion, 56th Air Defense Artillery Regiment at Fort Hood, Texas, on October 3, 2025. (Picture source: U.S. Department of War) Read More from World Defence News https://ift.tt/NYmsS1n via IFTTT

US-built first Saudi MMSC frigate HMS Saud launched at Fincantieri’s shipyard

According to information published by the Saudi Ministry of Defense on December 18, 2025, the first Multi-Mission Surface Combatant frigate constructed in the United States for the Royal Saudi Navy has been officially launched at Fincantieri Marinette Marine’s shipyard in Marinette, Wisconsin. The ship, designated HMS Saud with pennant number 820 and also known as Jalalat Al-Malik Saud in honor of King Saud, is the lead vessel in a four-ship program ordered under Project Tuwaiq through the U.S. Foreign Military Sales framework, a deal that defense officials have repeatedly described as a cornerstone of bilateral naval cooperation. Read more.   The HMS Saud (820) has an overall length of approximately 118 meters, in some sources detailed as 118.6 meters, with a beam of 17.6 meters, a draft of about 4.3 meters, and a full-load displacement estimated at roughly 3,600 tonnes. (Picture source: Saudi MoD) Read full Defense news.  from World Defence News https://ift....

Hellfire and JAGM Missiles Confirm Their Key Role in US Strike Power with New Contract

According to an announcement from the United States Department of Defense, Lockheed Martin has received a contract modification valued at $720 million for the fourth year of production of the Hellfire and Joint Air-to-Ground Missile (JAGM) systems. This award brings the total value of the agreement to approximately $1.49 billion. Work will be carried out at the company’s facilities in Ocala, Florida, with completion expected by September 30, 2028. The program is managed by the Army Contracting Command at Redstone Arsenal, Alabama, and is funded through the fiscal year 2025 missile procurement budget. Read more.  The JAGM, designated AGM-179, builds on the Hellfire’s design with an improved guidance system that incorporates a multi-mode seeker combining semi-active laser and millimeter-wave radar (Picture source: US DoD) Read full Defense news.  from World Defence News https://ift.tt/dvrFwSB via IFTTT