On March 13, 2025, the U.S. Navy received the 13th Ship to Shore Connector (SSC) unit, the Landing Craft, Air Cushion (LCAC) 112, from Textron Systems. This followed acceptance trials conducted by the Navy’s Board of Inspection and Survey, which evaluated the craft’s compliance with operational and technical requirements. LCAC 112 is part of the Ship to Shore Connector (SSC) program, developed to replace the existing fleet of Landing Craft, Air Cushion (LCAC) vehicles while maintaining compatibility with amphibious operations and incorporating updates in materials, propulsion, and onboard systems. Read full defense news at this link...
![]() |
The Ship to Shore Connector (SSC) program was initiated to replace the Landing Craft, Air Cushion (LCAC) fleet, which had been in service since the 1980s. (Picture source: US Navy) |
from World Defence News https://ift.tt/9wNzGYq
via IFTTT
Comments
Post a Comment