Skip to main content

More Classified Biden Documents Have Been Found At A New Location

 

NBC: Biden aides find second batch of classified documents at new location 

On Monday, the White House acknowledged a "small number" of classified documents had been found in an office Biden used. 

WASHINGTON — Aides to President Joe Biden have discovered at least one additional batch of classified documents in a location separate from the Washington office he used after leaving the Obama administration, according to a person familiar with the matter. 

Since November, after the discovery of documents with classified markings in his former office, Biden aides have been searching for any additional classified materials that might be in other locations he used, said the source, who spoke on the condition of anonymity to provide details about the ongoing inquiry. 

The White House did not reply to a request for comment. The Justice Department had no comment.  

Read more ....  

WNU Editor: This does not look good. Not good at all .... Penn Biden Center where classified papers were found is a ‘dark money nightmare’ (NYPost). And you just know that there are more documents elsewhere.  

Update: If another batch is found elsewhere, the pressure to appoint a Special Prosecutor will only grow .... Pressure builds on Garland to appoint special counsel after second batch of classified Biden documents found (FOX News). 

More Classified Biden Documents Have Been Found At A New Location  

Source: Biden team finds more docs with classified markings -- AP  

Second batch of classified Biden docs found at new location: report -- The Hill 

Biden's legal team found more classified docs, according to a person familiar with the investigation -- Politico  

Biden’s legal team found another batch of classified documents in search of second location -- CNN  

Biden aides discovered second batch of classified docs: NBC News -- NBC News  

Penn Biden Center where classified papers were found is a ‘dark money nightmare’ -- NYPost



from War News Updates https://ift.tt/fyhvajb
via IFTTT

Comments

Popular posts from this blog

Bath Iron Works starts building new Arleigh Burke-class Flight III destroyer USS J. William Middendorf

General Dynamics Bath Iron Works has started construction of the future USS J. William Middendorf (DDG 138), a Flight III Arleigh Burke-class destroyer that will strengthen the U.S. Navy’s missile-defense and escort capacity during sustained operations in the Red Sea, Eastern Mediterranean, and Indo-Pacific. The ceremonial first steel cut took place in Maine on May 19, 2026, as the Navy continues relying on Flight III destroyers equipped with the SPY-6 radar and Aegis Baseline 10 combat system to replace the air defense and command role of retiring Ticonderoga-class cruisers ahead of the future DDG(X) program.  Read full defense news at this link... USS J. William Middendorf belongs to the Flight III configuration that began with USS Jack H. Lucas (DDG 125), the first Flight III destroyer commissioned in October 2023. (Picture source: US Navy) Read more... from World Defence News https://ift.tt/tSRkVWI via IFTTT

U.S. Army Conducts Gunnery Exercise With Latest Air Defense System Sgt Stout.

U.S. Army officials confirmed that a live gunnery exercise at Fort Hood, Texas, is underway, featuring the latest-generation Sgt Stout short-range air defense system. The drills mark a significant step toward full operational integration as units across the force adapt to evolving threats from drones, rotary-wing aircraft, and low-flying munitions. It matters because Sgt. Stout enhances the Army’s ability to defend forward-deployed troops and critical infrastructure from modern aerial threats. Read full Defense News at this link ... A U.S. Army SGT Stout SHORAD air defense vehicle maneuvers into firing position during live-fire training with the 6th Battalion, 56th Air Defense Artillery Regiment at Fort Hood, Texas, on October 3, 2025. (Picture source: U.S. Department of War) Read More from World Defence News https://ift.tt/NYmsS1n via IFTTT

US-built first Saudi MMSC frigate HMS Saud launched at Fincantieri’s shipyard

According to information published by the Saudi Ministry of Defense on December 18, 2025, the first Multi-Mission Surface Combatant frigate constructed in the United States for the Royal Saudi Navy has been officially launched at Fincantieri Marinette Marine’s shipyard in Marinette, Wisconsin. The ship, designated HMS Saud with pennant number 820 and also known as Jalalat Al-Malik Saud in honor of King Saud, is the lead vessel in a four-ship program ordered under Project Tuwaiq through the U.S. Foreign Military Sales framework, a deal that defense officials have repeatedly described as a cornerstone of bilateral naval cooperation. Read more.   The HMS Saud (820) has an overall length of approximately 118 meters, in some sources detailed as 118.6 meters, with a beam of 17.6 meters, a draft of about 4.3 meters, and a full-load displacement estimated at roughly 3,600 tonnes. (Picture source: Saudi MoD) Read full Defense news.  from World Defence News https://ift....