Skip to main content

Ukraine Says More Than 260 Soldiers Evacuated From Mariupol Steel Plant

Buses carrying Ukrainian Azovstal servicemen arrive in Novoazovsk, © Reuters/ALEXANDER ERMOCHENKO  

Reuters: Ukrainian force begins evacuating from last Mariupol stronghold  

KYIV/MARIUPOL, Ukraine (Reuters) -The force holed up in the last Ukrainian stronghold in the besieged port of Mariupol began evacuating on Monday, appearing to cede control of the city to Russia after months of bombardment. 

Five buses carrying troops from the Azovstal steelworks arrived in the Russian-controlled town of Novoazovsk late on Monday, some 32 kilometres (20 miles) to the east, a Reuters witness said. 

Some of the evacuated troops were wounded and carried out of the buses on stretchers. Ukrainian Deputy Defence Minister Anna Malyar said 53 were taken to a hospital. 

It was not immediately clear how many troops were aboard the buses. Malyar said 211 other troops were taken to another site. Some 600 troops were believed to have been inside the steel plant.  

Read more .... 

Update #1: Ukraine strikes deal to evacuate around 50 wounded fighters from Mariupol Azovstal factory (FOX News)  

Update #2: Ceasefire reached to evacuate wounded from Azovstal plant in Ukraine’s Mariupol (AFP)  

Update #3: Injured troops to be evacuated from Azovstal – Moscow (RT)  

WNU Editor: There was no military point to stay in the steel plant. These Ukrainian soldiers have been surrounded for weeks, and their supplies had run out. The only question that remains unanswered is .... are there any Ukrainian soldiers left in this steel plant.



from War News Updates https://ift.tt/vWG5Jz9
via IFTTT

Comments

Popular posts from this blog

U.S. Army Conducts Gunnery Exercise With Latest Air Defense System Sgt Stout.

U.S. Army officials confirmed that a live gunnery exercise at Fort Hood, Texas, is underway, featuring the latest-generation Sgt Stout short-range air defense system. The drills mark a significant step toward full operational integration as units across the force adapt to evolving threats from drones, rotary-wing aircraft, and low-flying munitions. It matters because Sgt. Stout enhances the Army’s ability to defend forward-deployed troops and critical infrastructure from modern aerial threats. Read full Defense News at this link ... A U.S. Army SGT Stout SHORAD air defense vehicle maneuvers into firing position during live-fire training with the 6th Battalion, 56th Air Defense Artillery Regiment at Fort Hood, Texas, on October 3, 2025. (Picture source: U.S. Department of War) Read More from World Defence News https://ift.tt/NYmsS1n via IFTTT

US-built first Saudi MMSC frigate HMS Saud launched at Fincantieri’s shipyard

According to information published by the Saudi Ministry of Defense on December 18, 2025, the first Multi-Mission Surface Combatant frigate constructed in the United States for the Royal Saudi Navy has been officially launched at Fincantieri Marinette Marine’s shipyard in Marinette, Wisconsin. The ship, designated HMS Saud with pennant number 820 and also known as Jalalat Al-Malik Saud in honor of King Saud, is the lead vessel in a four-ship program ordered under Project Tuwaiq through the U.S. Foreign Military Sales framework, a deal that defense officials have repeatedly described as a cornerstone of bilateral naval cooperation. Read more.   The HMS Saud (820) has an overall length of approximately 118 meters, in some sources detailed as 118.6 meters, with a beam of 17.6 meters, a draft of about 4.3 meters, and a full-load displacement estimated at roughly 3,600 tonnes. (Picture source: Saudi MoD) Read full Defense news.  from World Defence News https://ift....

Hellfire and JAGM Missiles Confirm Their Key Role in US Strike Power with New Contract

According to an announcement from the United States Department of Defense, Lockheed Martin has received a contract modification valued at $720 million for the fourth year of production of the Hellfire and Joint Air-to-Ground Missile (JAGM) systems. This award brings the total value of the agreement to approximately $1.49 billion. Work will be carried out at the company’s facilities in Ocala, Florida, with completion expected by September 30, 2028. The program is managed by the Army Contracting Command at Redstone Arsenal, Alabama, and is funded through the fiscal year 2025 missile procurement budget. Read more.  The JAGM, designated AGM-179, builds on the Hellfire’s design with an improved guidance system that incorporates a multi-mode seeker combining semi-active laser and millimeter-wave radar (Picture source: US DoD) Read full Defense news.  from World Defence News https://ift.tt/dvrFwSB via IFTTT