Skip to main content

Russia Says 771 More Ukrainian Troops Surrendered Today At Mariupol's Azostal Steelworks For A Total Of 1,730 Since Monday

 

The Guardian: Russia says 771 more Ukrainian troops ‘surrender’ at Mariupol steelworks 

Injured soldiers being treated in hospital while 900 held in former prison colony, according to Moscow Russia has said a further 771 Ukrainian troops have “surrendered” at Mariupol’s besieged Azovstal steelworks, bringing the total number to 1,730 this week, while the International Committee of the Red Cross (ICRC) said it had started registering the Ukrainian prisoners of war who left the plant.

The Russian defence ministry said that 80 soldiers who surrendered in the past day were wounded and were being treated in hospitals in the Russian-held cities of Novoazovsk and Donetsk. 

Russia’s foreign ministry spokesperson, Maria Zakharova, said on Wednesday that more than 900 Azovsteel troops had been sent to a former prison colony in the town of Olenivka but it was not immediately clear where the latest group to surrender had gone.  

Read more .... 

WNU Editor: According to Patrick Lancaster (link here), DPR and Russian forces believe there are about 500 Ukrainian soldiers still remaining in the plant.

Russia Says 771 More Ukrainian Troops Surrendered Today At Mariupol's Azostal Steelworks For A Total Of 1,730 Since Monday   

More Ukrainians surrender in Mariupol – Russia -- RT  

Another 771 Ukrainian militants surrender at Azovstal plant — Russian top brass -- TASS 

1,730 Ukrainian Soldiers Surrendered At Azovstal Plant This Week: Russia -- AFP  

Ukrainian troops surrendering at Mariupol registered as POWs -- AP 

ICRC says it has registered hundreds of PoWs from Azovstal -- The New Voice of Ukraine



from War News Updates https://ift.tt/zaVxLuS
via IFTTT

Comments

Popular posts from this blog

Bath Iron Works starts building new Arleigh Burke-class Flight III destroyer USS J. William Middendorf

General Dynamics Bath Iron Works has started construction of the future USS J. William Middendorf (DDG 138), a Flight III Arleigh Burke-class destroyer that will strengthen the U.S. Navy’s missile-defense and escort capacity during sustained operations in the Red Sea, Eastern Mediterranean, and Indo-Pacific. The ceremonial first steel cut took place in Maine on May 19, 2026, as the Navy continues relying on Flight III destroyers equipped with the SPY-6 radar and Aegis Baseline 10 combat system to replace the air defense and command role of retiring Ticonderoga-class cruisers ahead of the future DDG(X) program.  Read full defense news at this link... USS J. William Middendorf belongs to the Flight III configuration that began with USS Jack H. Lucas (DDG 125), the first Flight III destroyer commissioned in October 2023. (Picture source: US Navy) Read more... from World Defence News https://ift.tt/tSRkVWI via IFTTT

U.S. Army Conducts Gunnery Exercise With Latest Air Defense System Sgt Stout.

U.S. Army officials confirmed that a live gunnery exercise at Fort Hood, Texas, is underway, featuring the latest-generation Sgt Stout short-range air defense system. The drills mark a significant step toward full operational integration as units across the force adapt to evolving threats from drones, rotary-wing aircraft, and low-flying munitions. It matters because Sgt. Stout enhances the Army’s ability to defend forward-deployed troops and critical infrastructure from modern aerial threats. Read full Defense News at this link ... A U.S. Army SGT Stout SHORAD air defense vehicle maneuvers into firing position during live-fire training with the 6th Battalion, 56th Air Defense Artillery Regiment at Fort Hood, Texas, on October 3, 2025. (Picture source: U.S. Department of War) Read More from World Defence News https://ift.tt/NYmsS1n via IFTTT

US-built first Saudi MMSC frigate HMS Saud launched at Fincantieri’s shipyard

According to information published by the Saudi Ministry of Defense on December 18, 2025, the first Multi-Mission Surface Combatant frigate constructed in the United States for the Royal Saudi Navy has been officially launched at Fincantieri Marinette Marine’s shipyard in Marinette, Wisconsin. The ship, designated HMS Saud with pennant number 820 and also known as Jalalat Al-Malik Saud in honor of King Saud, is the lead vessel in a four-ship program ordered under Project Tuwaiq through the U.S. Foreign Military Sales framework, a deal that defense officials have repeatedly described as a cornerstone of bilateral naval cooperation. Read more.   The HMS Saud (820) has an overall length of approximately 118 meters, in some sources detailed as 118.6 meters, with a beam of 17.6 meters, a draft of about 4.3 meters, and a full-load displacement estimated at roughly 3,600 tonnes. (Picture source: Saudi MoD) Read full Defense news.  from World Defence News https://ift....