Skip to main content

Russia Says 771 More Ukrainian Troops Surrendered Today At Mariupol's Azostal Steelworks For A Total Of 1,730 Since Monday

 

The Guardian: Russia says 771 more Ukrainian troops ‘surrender’ at Mariupol steelworks 

Injured soldiers being treated in hospital while 900 held in former prison colony, according to Moscow Russia has said a further 771 Ukrainian troops have “surrendered” at Mariupol’s besieged Azovstal steelworks, bringing the total number to 1,730 this week, while the International Committee of the Red Cross (ICRC) said it had started registering the Ukrainian prisoners of war who left the plant.

The Russian defence ministry said that 80 soldiers who surrendered in the past day were wounded and were being treated in hospitals in the Russian-held cities of Novoazovsk and Donetsk. 

Russia’s foreign ministry spokesperson, Maria Zakharova, said on Wednesday that more than 900 Azovsteel troops had been sent to a former prison colony in the town of Olenivka but it was not immediately clear where the latest group to surrender had gone.  

Read more .... 

WNU Editor: According to Patrick Lancaster (link here), DPR and Russian forces believe there are about 500 Ukrainian soldiers still remaining in the plant.

Russia Says 771 More Ukrainian Troops Surrendered Today At Mariupol's Azostal Steelworks For A Total Of 1,730 Since Monday   

More Ukrainians surrender in Mariupol – Russia -- RT  

Another 771 Ukrainian militants surrender at Azovstal plant — Russian top brass -- TASS 

1,730 Ukrainian Soldiers Surrendered At Azovstal Plant This Week: Russia -- AFP  

Ukrainian troops surrendering at Mariupol registered as POWs -- AP 

ICRC says it has registered hundreds of PoWs from Azovstal -- The New Voice of Ukraine



from War News Updates https://ift.tt/zaVxLuS
via IFTTT

Comments

Popular posts from this blog

U.S. Army Conducts Gunnery Exercise With Latest Air Defense System Sgt Stout.

U.S. Army officials confirmed that a live gunnery exercise at Fort Hood, Texas, is underway, featuring the latest-generation Sgt Stout short-range air defense system. The drills mark a significant step toward full operational integration as units across the force adapt to evolving threats from drones, rotary-wing aircraft, and low-flying munitions. It matters because Sgt. Stout enhances the Army’s ability to defend forward-deployed troops and critical infrastructure from modern aerial threats. Read full Defense News at this link ... A U.S. Army SGT Stout SHORAD air defense vehicle maneuvers into firing position during live-fire training with the 6th Battalion, 56th Air Defense Artillery Regiment at Fort Hood, Texas, on October 3, 2025. (Picture source: U.S. Department of War) Read More from World Defence News https://ift.tt/NYmsS1n via IFTTT

US-built first Saudi MMSC frigate HMS Saud launched at Fincantieri’s shipyard

According to information published by the Saudi Ministry of Defense on December 18, 2025, the first Multi-Mission Surface Combatant frigate constructed in the United States for the Royal Saudi Navy has been officially launched at Fincantieri Marinette Marine’s shipyard in Marinette, Wisconsin. The ship, designated HMS Saud with pennant number 820 and also known as Jalalat Al-Malik Saud in honor of King Saud, is the lead vessel in a four-ship program ordered under Project Tuwaiq through the U.S. Foreign Military Sales framework, a deal that defense officials have repeatedly described as a cornerstone of bilateral naval cooperation. Read more.   The HMS Saud (820) has an overall length of approximately 118 meters, in some sources detailed as 118.6 meters, with a beam of 17.6 meters, a draft of about 4.3 meters, and a full-load displacement estimated at roughly 3,600 tonnes. (Picture source: Saudi MoD) Read full Defense news.  from World Defence News https://ift....

Hellfire and JAGM Missiles Confirm Their Key Role in US Strike Power with New Contract

According to an announcement from the United States Department of Defense, Lockheed Martin has received a contract modification valued at $720 million for the fourth year of production of the Hellfire and Joint Air-to-Ground Missile (JAGM) systems. This award brings the total value of the agreement to approximately $1.49 billion. Work will be carried out at the company’s facilities in Ocala, Florida, with completion expected by September 30, 2028. The program is managed by the Army Contracting Command at Redstone Arsenal, Alabama, and is funded through the fiscal year 2025 missile procurement budget. Read more.  The JAGM, designated AGM-179, builds on the Hellfire’s design with an improved guidance system that incorporates a multi-mode seeker combining semi-active laser and millimeter-wave radar (Picture source: US DoD) Read full Defense news.  from World Defence News https://ift.tt/dvrFwSB via IFTTT