Skip to main content

UN Wants A Quick Response From Iran On Expired Nuclear Monitoring Deal

Director General of the International Atomic Energy Agency, IAEA, Rafael Mariano Grossi from Argentina, addresses the media during a news conference behind plexiglass shields regarding the agency's monitoring of Iran's nuclear energy program at the International Center in Vienna, Austria, June 7, 2021. (AP Photo/Lisa Leutner)  

Reuters: IAEA demands Iran answer on monitoring, Iran says not obliged to reply 

VIENNA/PARIS (Reuters) -The U.N. nuclear watchdog on Friday demanded an immediate reply from Iran on whether it would extend a monitoring agreement that expired overnight, prompting an Iranian envoy to respond that Tehran was under no obligation to provide an answer. 

The agreement continued the International Atomic Energy Agency's collection of data on some of Tehran's activities, cushioning the blow of Iran's decision in February to reduce cooperation with the agency. 

"An immediate response from Iran is needed in this regard," the IAEA said in a statement summarizing a report by its chief Rafael Grossi to its 35-nation Board of Governors that was also seen by Reuters. 

Grossi wrote to Iran last week "to understand Iran's position regarding the possible continued collection, recording and retention of data", the report said. 

As of Friday, Iran had not indicated if it intended to maintain the arrangement, it said.  

Read more .... 

More News On The UN Wanting A Quick Response From Iran On Expired Nuclear Monitoring Deal  

UN atomic agency: ‘No reply’ from Iran on expired nuclear inspections deal -- Times of Israel/AFP 

UN wants quick response from Iran on expired nuclear monitoring deal -- Middle East Eye

IAEA demands ‘immediate response’ from Iran over extending nuclear monitoring agreement -- RT  

Iran: Recording nuclear data is a political decision not related to IAEA -- Tehran Times  

Iran says it’s not required to comply with UN nuclear watchdog’s demand of ‘immediate response’ on extending monitoring deal -- RT



from War News Updates https://ift.tt/3hd7zAY
via IFTTT

Comments

Popular posts from this blog

Bath Iron Works starts building new Arleigh Burke-class Flight III destroyer USS J. William Middendorf

General Dynamics Bath Iron Works has started construction of the future USS J. William Middendorf (DDG 138), a Flight III Arleigh Burke-class destroyer that will strengthen the U.S. Navy’s missile-defense and escort capacity during sustained operations in the Red Sea, Eastern Mediterranean, and Indo-Pacific. The ceremonial first steel cut took place in Maine on May 19, 2026, as the Navy continues relying on Flight III destroyers equipped with the SPY-6 radar and Aegis Baseline 10 combat system to replace the air defense and command role of retiring Ticonderoga-class cruisers ahead of the future DDG(X) program.  Read full defense news at this link... USS J. William Middendorf belongs to the Flight III configuration that began with USS Jack H. Lucas (DDG 125), the first Flight III destroyer commissioned in October 2023. (Picture source: US Navy) Read more... from World Defence News https://ift.tt/tSRkVWI via IFTTT

U.S. Army Conducts Gunnery Exercise With Latest Air Defense System Sgt Stout.

U.S. Army officials confirmed that a live gunnery exercise at Fort Hood, Texas, is underway, featuring the latest-generation Sgt Stout short-range air defense system. The drills mark a significant step toward full operational integration as units across the force adapt to evolving threats from drones, rotary-wing aircraft, and low-flying munitions. It matters because Sgt. Stout enhances the Army’s ability to defend forward-deployed troops and critical infrastructure from modern aerial threats. Read full Defense News at this link ... A U.S. Army SGT Stout SHORAD air defense vehicle maneuvers into firing position during live-fire training with the 6th Battalion, 56th Air Defense Artillery Regiment at Fort Hood, Texas, on October 3, 2025. (Picture source: U.S. Department of War) Read More from World Defence News https://ift.tt/NYmsS1n via IFTTT

US-built first Saudi MMSC frigate HMS Saud launched at Fincantieri’s shipyard

According to information published by the Saudi Ministry of Defense on December 18, 2025, the first Multi-Mission Surface Combatant frigate constructed in the United States for the Royal Saudi Navy has been officially launched at Fincantieri Marinette Marine’s shipyard in Marinette, Wisconsin. The ship, designated HMS Saud with pennant number 820 and also known as Jalalat Al-Malik Saud in honor of King Saud, is the lead vessel in a four-ship program ordered under Project Tuwaiq through the U.S. Foreign Military Sales framework, a deal that defense officials have repeatedly described as a cornerstone of bilateral naval cooperation. Read more.   The HMS Saud (820) has an overall length of approximately 118 meters, in some sources detailed as 118.6 meters, with a beam of 17.6 meters, a draft of about 4.3 meters, and a full-load displacement estimated at roughly 3,600 tonnes. (Picture source: Saudi MoD) Read full Defense news.  from World Defence News https://ift....