As reported by Taiwan Arms Tracker on June 2, 2025, Taiwan is preparing to receive the second batch of M1A2T main battle tanks and M88A2 armored recovery vehicles from the United States by the end of June 2025. This batch consists of 42 M1A2Ts and 4 M88A2s and follows the first delivery of 38 tanks and 4 recovery vehicles that arrived in mid-December 2024. The vehicles were observed at the Port of Los Angeles, with footage showing vehicles stored in a container yard before maritime transport. Read full defense news at this link...
from World Defence News https://ift.tt/tKdIOiS
via IFTTT

Comments
Post a Comment