Skip to main content

U.S. Air Force's X-37B Space Plane Is Preparing To Launch In May On Its Sixth Mission

The US Air Force’s mysterious space plane aims to break another record by spending longer than two years in low-Earth orbit. The X-37B is set to take off on May 16 and is not expected to return home until mid-2022 – the previous record was a 780-day mission in 2019 (pictured)

Daily Mail: Secretive Air Force X-37B space plane is launching its sixth mission in May that's expected to break its previous record of 780 days in low orbit

* The X-37B space plane is set to go on its sixth mission on May 16 from Florida
* The craft is expected to again spend more than two years in space after its prior 780-day mission
* The space plane allows the US Air Force to secretly test new technologies

The US Air Force’s mysterious space plane aims to break another record by again spending longer than two years in low-Earth orbit.

The X-37B is set to take off on May 16 and is not expected to return home until mid-2022 – the previous record was a 780-day mission that finished in 2019.

The mission, dubbed OTV-6, is set to take off from Cape Canaveral Air Force Station in Florida, riding atop a liquid fueled Atlas V rocket.

This pilotless craft has been performing a range of classified missions for the military group since 2010, allowing the group to test new technologies in space.

Read more ....

More News On The U.S. Air Force's X-37B Space Plane Preparing To Launch In May

The X-37B Spaceplane Is Gearing Up for Its Next Mission -- Popular Mechanics
ULA begins stacking rocket for next launch of U.S. military spaceplane -- SpaceFlight Now
The U.S. Air Force's X-37B Space Plane Could Soon Leave Earth for 2 Years -- National Interest

from War News Updates https://ift.tt/3eWR8H4
via IFTTT

Comments

Popular posts from this blog

US-built first Saudi MMSC frigate HMS Saud launched at Fincantieri’s shipyard

According to information published by the Saudi Ministry of Defense on December 18, 2025, the first Multi-Mission Surface Combatant frigate constructed in the United States for the Royal Saudi Navy has been officially launched at Fincantieri Marinette Marine’s shipyard in Marinette, Wisconsin. The ship, designated HMS Saud with pennant number 820 and also known as Jalalat Al-Malik Saud in honor of King Saud, is the lead vessel in a four-ship program ordered under Project Tuwaiq through the U.S. Foreign Military Sales framework, a deal that defense officials have repeatedly described as a cornerstone of bilateral naval cooperation. Read more.   The HMS Saud (820) has an overall length of approximately 118 meters, in some sources detailed as 118.6 meters, with a beam of 17.6 meters, a draft of about 4.3 meters, and a full-load displacement estimated at roughly 3,600 tonnes. (Picture source: Saudi MoD) Read full Defense news.  from World Defence News https://ift....

U.S. Army Conducts Gunnery Exercise With Latest Air Defense System Sgt Stout.

U.S. Army officials confirmed that a live gunnery exercise at Fort Hood, Texas, is underway, featuring the latest-generation Sgt Stout short-range air defense system. The drills mark a significant step toward full operational integration as units across the force adapt to evolving threats from drones, rotary-wing aircraft, and low-flying munitions. It matters because Sgt. Stout enhances the Army’s ability to defend forward-deployed troops and critical infrastructure from modern aerial threats. Read full Defense News at this link ... A U.S. Army SGT Stout SHORAD air defense vehicle maneuvers into firing position during live-fire training with the 6th Battalion, 56th Air Defense Artillery Regiment at Fort Hood, Texas, on October 3, 2025. (Picture source: U.S. Department of War) Read More from World Defence News https://ift.tt/NYmsS1n via IFTTT

Bath Iron Works starts building new Arleigh Burke-class Flight III destroyer USS J. William Middendorf

General Dynamics Bath Iron Works has started construction of the future USS J. William Middendorf (DDG 138), a Flight III Arleigh Burke-class destroyer that will strengthen the U.S. Navy’s missile-defense and escort capacity during sustained operations in the Red Sea, Eastern Mediterranean, and Indo-Pacific. The ceremonial first steel cut took place in Maine on May 19, 2026, as the Navy continues relying on Flight III destroyers equipped with the SPY-6 radar and Aegis Baseline 10 combat system to replace the air defense and command role of retiring Ticonderoga-class cruisers ahead of the future DDG(X) program.  Read full defense news at this link... USS J. William Middendorf belongs to the Flight III configuration that began with USS Jack H. Lucas (DDG 125), the first Flight III destroyer commissioned in October 2023. (Picture source: US Navy) Read more... from World Defence News https://ift.tt/tSRkVWI via IFTTT